Design & Engineering
Cooling-load calculation, equipment selection and plant-room layout with piping and electrical single-line drawings.
Learn moreFrom load calculation to annual maintenance — one engineering team that designs, installs, commissions and keeps your plant running.
Every job is handled by MHM engineers from the first survey to the last maintenance visit — no hand-offs between vendors.
Cooling-load calculation, equipment selection and plant-room layout with piping and electrical single-line drawings.
Learn moreChillers, towers, pumps, AHUs and panels delivered, rigged, piped and wired by our own site crews.
Learn moreFlow balancing, approach and delta-T checks, vibration and electrical tests signed off with a commissioning report.
Learn moreScheduled visits, water-side and air-side cleaning, chemical dosing and a written log after every visit.
Learn moreCompressor swaps, motor rewinding, coil and tube cleaning, VFD retrofits — with a 48-hour target for critical parts.
Learn moreInfill, nozzles, sprinklers, fans, motors, seals and compressors stocked in Mirpur for MHM, Carrier, TICA and Genius units.
Learn moreA typical 200 TR plant moves through these stages in 8–12 weeks. Every stage ends with a document you keep.
Site visit within 48 h, load measurement and utility audit.
Selection, layout, piping and electrical drawings for approval.
Equipment sourced from MHM, Carrier, TICA, Genius and Newin stock.
Rigging, piping, wiring, balancing and a signed commissioning report.
AMC visits, spares and a service log for the life of the plant.
Sample pricing for a single 100–200 TR chiller plant with one cooling tower and two pump sets. Larger plants are quoted after a survey.
A 10-year-old chiller usually loses 15–25% of its capacity to fouling, worn seals and drifting controls. An overhaul recovers most of it for a fraction of replacement cost.
Tell us the unit, the fault and your location. A service engineer calls back within the hour with a plan and a visit slot.
+880 1321-206755Inside Dhaka we are usually on site the same day; AMC clients get priority dispatch.
Compressors, seals, motors, infill and nozzles on the shelf at East Shewrapara — no waiting for imports.
Every visit ends with readings, parts used and recommendations signed by the engineer.
Still unsure? Call the service line or send the plant details through the contact form and an engineer will reply the same working day.
Inside Dhaka, within 48 hours of your call. Outside Dhaka we schedule within a week. The survey is free for projects over 50 TR and the report is yours to keep.
Yes. Our engineers maintain Carrier, TICA, York, Trane, Daikin and Chinese-built chillers, plus Genius and Newin cooling towers and most pump brands. Spares for Carrier and TICA are stocked; others are ordered on request.
Scheduled visits, cleaning, testing, a written report per visit and phone support. Standard adds chemicals and 24-hour breakdown response; Comprehensive adds consumable spares, 8-hour response and energy reporting. Major parts such as compressors are quoted separately unless stated.
Yes. R134a, R410A, R407C and R22 are kept in stock with recovery equipment for safe charging, and Finor water-treatment chemicals for towers and closed loops are supplied and dosed by us.
New equipment carries the manufacturer warranty (12–24 months) plus 12 months on our installation workmanship. Repairs and rewinding carry 6 months; genuine spare parts carry 12 months when fitted by MHM.
Both. Service calls and small parts can be paid by bKash or Nagad against an invoice. AMC and project work is invoiced to your company with bank transfer, cheque or LC; AMC is 50% on signing and 50% after the second quarter.