Service

Annual Maintenance Contract

Scheduled visits, water-side and air-side cleaning, chemical dosing and a written log after every visit — Basic, Standard or Comprehensive.

PlansBasic · Standard · Comprehensive
Breakdown line24 / 7
Brands coveredMHM, Carrier, TICA, York, Trane, Daikin…
ReportsAfter every visit
Annual Maintenance Contract — MHM Engineering

An AMC with MHM means the same engineers who commissioned your plant come back on a schedule, with the spares and chemicals they need, and leave a written report every time. Approach temperatures, currents, pressures and water quality are logged visit after visit, so a fouling condenser or a failing bearing is caught months before it stops production.

Three plans cover every budget: Basic (quarterly), Standard (monthly with 24-hour breakdown response) and Comprehensive (fortnightly with consumable spares, 8-hour response and energy reporting). All plans include phone support and priority on breakdowns.

What is included

Everything annual maintenance contract covers

Scheduled service visits

Quarterly, monthly or fortnightly by plan; date-fixed and confirmed a week ahead.

Condenser & tower cleaning

Tube brushing, coil washing, basin and fill cleaning, strainer service.

Performance log

Approach, Δt, kW/TR, vibration and water tests recorded against the commissioning baseline.

Water treatment

Scale, corrosion and biocide programme with monthly analysis (Standard and above).

Breakdown response

24 h (Standard) or 8 h (Comprehensive) with a standby engineer and Mirpur spares stock.

Reports & energy review

Written report per visit; quarterly energy and reliability review on Comprehensive.

How it works

From first call to handover

  1. 1

    Plant audit

    Free inspection of every asset to be covered; baseline readings and a spares list.

  2. 2

    Plan & schedule

    Basic / Standard / Comprehensive chosen per asset; visit calendar issued for the year.

  3. 3

    Service visits

    Checklist-driven work, cleaning, dosing and a report signed by your engineer.

  4. 4

    Annual review

    Trend review, spares consumed, recommendations and renewal — no automatic price increase.

Downloads

Catalogues and data sheets for this work

MHM Chiller SpecificationMHM · Data sheet
423 KB Download
MHM WCS Series CatalogueMHM · Catalogue
605 KB Download
MHM Bottle Type Cooling Tower SpecificationMHM · Data sheet
490 KB Download
MHM Spare Parts List CatalogueMHM · Spare parts list
46 KB Download
MHM AHU / FCU CatalogueMHM · Catalogue
372 KB Download
Carrier VRF Systems CatalogueCarrier · Catalogue
373 KB Download

Open the download centre

Questions

Common questions about annual maintenance contract

Consumables (filters, belts, seals, nozzles, gaskets) are included in Comprehensive. Major parts such as compressors and motors are quoted separately in every plan, at contract rates.

Yes — Carrier, TICA, York, Trane, Daikin and most Chinese-built screw and scroll chillers, plus Genius and Newin towers and all common pump brands.

Contracts start any month and run for 12 months; the price is pro-rated if you align the renewal with your financial year.

Talk to the team that does the work

Tell us your plant, brand and problem — an MHM engineer replies within one working day with next steps and a price.