Supply & Installation

Chillers, towers, pumps, AHUs and panels delivered, rigged, piped and wired by our own site teams — one contractor, one warranty.

Own site teams40+ technicians
FabricationMirpur workshop
Typical chiller install2–3 weeks
Warranty12–18 months
Supply & Installation — MHM Engineering

MHM supplies its own chillers, cooling towers, AHUs, pumps and panels assembled in Mirpur, plus Carrier, TICA, Genius, Newin, LEO, Siemens and KMC equipment from stock or on order. The same company then installs it: rigging, foundations, chilled- and condenser-water piping, ducting, insulation, power and control wiring.

Our site teams are MHM employees, not day labour. Welders are certified, piping is pressure-tested and flushed before the evaporator is connected, ducting is leak-tested before insulation, and every panel is torque-checked and thermographed under load.

Projects run to a written programme with weekly reports, so a dyeing line or a ward is shut for hours, not days.

What is included

Everything supply & installation covers

Equipment supply

MHM-assembled units and partner brands with factory test certificates and warranty cards.

Rigging & foundations

Crane plan, RCC pads or steel frames, anti-vibration mounts and anchor bolts per our drawings.

Piping, ducting & insulation

GI/MS/PPR pipework, GI ducting to SMACNA gauges, closed-cell insulation with vapour barrier and cladding.

Power & control wiring

Feeders, starters, VFDs, sensors and BMS cabling in segregated trays and conduits.

Pump sets & water treatment

Pumps aligned on grouted bases; softeners, dosing and filtration skids piped in.

Safety & site management

Permit-to-work, hot-work control, PPE and daily toolbox talks on every MHM site.

How it works

From first call to handover

  1. 1

    Kick-off & programme

    Approved drawings, delivery dates and a shutdown plan agreed with your plant team.

  2. 2

    Civil & rigging

    Pads cured, equipment lifted and set — typically one day per chiller or tower.

  3. 3

    Piping, ducting & electrical

    Fabricated spools and ducts installed, tested, insulated; panels and cabling completed.

  4. 4

    Pre-commissioning

    Flushing, pressure tests, insulation-resistance tests and rotation checks signed off.

Downloads

Catalogues and data sheets for this work

MHM Chiller SpecificationMHM · Data sheet
423 KB Download
MHM WCS Series CatalogueMHM · Catalogue
605 KB Download
MHM Bottle Type Cooling Tower SpecificationMHM · Data sheet
490 KB Download
MHM Spare Parts List CatalogueMHM · Spare parts list
46 KB Download
MHM AHU / FCU CatalogueMHM · Catalogue
372 KB Download
Carrier VRF Systems CatalogueCarrier · Catalogue
373 KB Download

Open the download centre

Questions

Common questions about supply & installation

Yes. We regularly install and pipe imported chillers and towers for EPC contractors; you get the same tests and documentation.

Night and Friday shifts, temporary bypasses and staged tie-ins are planned in the programme so production is not interrupted.

Chattogram, Gazipur, Narayanganj, Savar, Mymensingh, Sylhet and Khulna are regular; further sites are quoted with lodging included.

Talk to the team that does the work

Tell us your plant, brand and problem — an MHM engineer replies within one working day with next steps and a price.